-
CO2 Refill Station-Single Acting (High Pressure) -
CO2 Refill Station-Dual Acting {Low+High Pressure) -
Crystal8 - 5.2kw Industrial Glycol Chiller - 220v - Single Phase -
Crystal8 - 9.1kw Industrial Glycol Chiller - 380v - Three Phase -
Maltzilla Industrial - Grain Mill - 1.1kw (300kg/hr) - Three Phase -
2 Inch TC RIMS Element and Housing (6kw) -
BrewZilla 400L -
Crystal8 - 23kw Industrial Glycol Chiller - 380v - Three Phase -
Maltzilla Industrial - Grain Mill - 2.2kw (800kg/hr) -
100L Conical Fermenter (pressurisable, jacketed) -
BrewZilla 300L - 3 Vessel Brewery -
BrewZilla Micro - 50L Clean in Place (CIP) Cart -
800L Conical Fermenter (pressurisable, jacketed) -
400L Conical Fermenter (pressurisable, jacketed) -
200L Conical Fermenter (pressurisable, jacketed) -
450L Conical Fermenter (pressurisable, jacketed) -
Replacement of Heating Element (12kw)- BrewZilla 200L -
1000L Conical Fermenter (pressurisable, jacketed) -
600L Conical Fermenter (pressurisable, jacketed) -
FlexiRoyal - Unswaged Brewery Hose - 1.5 Inch (38mm) ID - 40m/roll - (Not Including TC) -
FlexiRoyal - Unswaged Brewery Hose - 3/4 Inch (19mm) ID - 40m/roll - (Not Including TC) -
Crystal8 - 58kw Industrial Glycol Chiller- 380v - Three Phase -
300L Conical Fermenter (pressurisable, jacketed) -
TeleTank 500L - Jacketed Pressurisable Fermenter/Uni-Tank (150degree)